PINTO was engaged by SNC-Lavalin to act as peer reviewer for the design engineers on the refurbishment of the Princess Margaret Bridge in Fredericton, NB. PINTO's role was to review and sign-off on all provided structural design calculations involved with the concrete piers, structural steel trusses, structural steel girders, and concrete bridge decks. Project completed in 2011.
